Low-Temperature External-Heating Reduction System
for Organic Chlorine Compounds
Put into Operation in 2001
Calcination Plant
for Polluted Soil, Incinerated Ash and Construction Surplus Soil
Put into Operation in 2000
Highly-Efficient Carbonizing Furnace
for Wood Waste and Other General Waste
Put into operation in 2000
Recycling Plant
for Construction Material Waste
Put into Operation in 1997
Incineration Plant for Disposal of Waste with Dioxin Emission Control
Put into Operation in 1997
Deodorizing and Drying Facility
for Odor-Emitting Materials (Manure/Feed)
Put into Operation in 1995
Large-Scale Comprehensive Disposal Plant
for Sludge, Oil Waste, Wood Waste, Resin Waste and Medical Waste
Put into Operation in 1994
Large-Scale Disposal Plant
for Liquid Waste, Oil Waste, Resin Waste and Medical Waste
Put into Operation in 1994
Drying and Incineration Facility
for Organic/Inorganic Sludge
Put into Operation in 1993
Large-Scale Disposal Plant with Heat Recovery
for following Waste as Wood, Plastic, Infectious, Oil and Other Types
Put into Operation in 1988